Cost Savings
    
This example shows a part where the shaving operation was replaced with a reheading operation.  Shaving required additional length in order to hold the product, 
and a larger blank size for the shoulder diameter. 
  
Material Savings was in excess of 22 grams each or 48 lbs./M.  The reheading process was also 66% faster than shaving with no product waste.   
Tubular Product  
  
Special Machine built for tube extrusion tripled production rates and improved quality.  End extrusion inner diameter being held to ±.004” 
						
					 |